top of page
KEY HIGHLIGHTS
-
SWM:
- Ward is divided into 41 blocks to manage SWM
- Ward has 1 Dry waste collection center
- The land is identified for decentralized waste processing units -
Sewage: Capacity of existing 2 Nos. of STPs is 780 KLD
-
Ward has 7 public toilets
-
Power HT line passes through the ward

Public Utility_Page_1

Public Utility_Page_2

Public Utility_Page_8

Public Utility_Page_1
1/8
(Click on image to expand)
bottom of page